Doosan GC33E-5 Specifiche Pagina 46

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 92
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 45
Vehicle System Disassembly & Assembly 44
Secondary Lift Cylinder
Disassemble Secondary Lift Cylinder
Tools Needed A
B
Hydraulic Cylinder Repair Stand 1
Wrench Assembly 1
Start By:
a. Remove standard lift cylinders.
1. Put standard lift cylinder (1) in position on tool (A).
2. Remove bearing (2) with tool (B).
3. Remove rod (3) from the cylinder body.
4. Remove stop ring (4) from the cylinder rod.
5. Remove wear ring(5), U-packing(6) and backup
ring(7).
6. Remove retaining ring(8), spacer(9) and check
valve(10).
IDCD204P
IDCD206P
IDCD207P
3
4
5
6
7
8
9
10
IDCD201P
IDCD203P
A
1
2
B
Vedere la pagina 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 91 92

Commenti su questo manuale

Nessun commento