Doosan GC33E-5 Specifiche Pagina 18

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 92
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 17
Vehicle System Disassembly & Assembly 16
10. Install chain guard/hose support assembly (6) and
four bolts (8) to a torque of 28 ± 7 N·m (20 ± 5
lb·ft).
11. Connect two hydraulic line (4) in their original
positions.
12. Install stopper bolt (13) on the inner mast.
End By:
a. Install backrest.
b. Install forks.
Disassemble Carriage
Start By:
a. Remove carriage.
Typical Example
1. Remove the roll pins and pins (2) to disconnect
chains (1).
2. Remove four lower roller bearings (3) and theshims
from the carriage.
3. Remove screw (5) and washer (4). Remove
toproller bearings (6) and the shims.
13
6
8
4
Vedere la pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 91 92

Commenti su questo manuale

Nessun commento